Our projects

reshZhezkazgan — Beyneu line The construction started in June 2012. The Zhezkazgan-Beyneu line is the longest railway span. As a result of launching these lines the route of cargo traffic from the east to the west of the country will become 1000 km shorter. 48 new stations and crossing loops are being set along the new railway lines. Electric power lines, industrial buildings and facilities, accommodation and social units are being built at the moment. 3 500 permanent work positions are being prepared. Launching the Zhezkazgan-Beyneu and Arkalyk-Shubarkol lines will provide trade and business partners with the shortest routes for transit transport from Europe to Asia and vice versa with all the related economic benefits.

reshKuryk seaport Our company participates in the construction of Kuryk seaport from 2015. The Kuryk seaport is located a hundred kilometers away from Aktau. The expansion of the Aktau sea port and the construction of the ferry complex in the Kuryk port will increase the port capacity of Kazakhstan in the Caspian Sea up to 24 million metric tons via the North-South corridor (New Silk Way). Moreover, the ports of Kazakhstan will be able to handle six million metric tons of ferry cargo annually. Ferry complex delivering four million of cargo per year, will carry consumer goods, grain, oil products, liquefied natural gas, fertilizers and other goods. To be in full operation of plant almost 250 people were hired on a steady job.

transTaskhent metallurgical factory Our company participates in the construction of Taskhent metallurgical factory from 2017. Company provide order and supply the equipment for heavy industry production. The construction of the enterprise on 100 ha is planned be carried out within 24 months. The plant will be equipped with modern technologies from Italy, Germany, Austria and other countries. It will manufacture metal sheets for car bodies, home appliances, metal tiles, corrugated boards. In full capacity, the plant is expected to employ over 1000 workers.